Basic Info.
Model NO.
SYP73
Type
Cooling Fan
Electric Current Type
AC
Mounting
Ceiling Fan
Certification
ISO, CE, CCC
Power
1.5kw
Voltage
220/380/415V
Frequency
50/60Hz
Diameter
24FT
Speed
70rpm
Weight
120kg
Coverage
1200m2
Air Volume
13800m3/M
Transport Package
Non Fumigation Wooden Box
Specification
1CBM
Trademark
SIYI
Origin
Shanghai, China
HS Code
8414599099
Production Capacity
10000PCS/Year
Product Description

Performance
1, Accelerated Airflow
SIYI industrial ceiling fan can bring a large area of gentle breeze blows, achieving a natural three-dimensional airflow.
2, Dust Removal
SIYI industrial ceiling fan can achieve environmental dust removal effect combined with ventilation equipment.
3, Dehumidifying & Cooling
Fan Details 2, Dust Removal
SIYI industrial ceiling fan can achieve environmental dust removal effect combined with ventilation equipment.
3, Dehumidifying & Cooling
Keeping the indoor environment dry and reducing the growth of bacteria.
4, Efficient & Energy-saving
Low power consumption, saving about 90% energy compared to common small fans.
5, Safe & Reliable
Five layers of safety protection measures can ensure that the fan will not fall.
Advantage
4, Efficient & Energy-saving
Low power consumption, saving about 90% energy compared to common small fans.
5, Safe & Reliable
Five layers of safety protection measures can ensure that the fan will not fall.
Advantage
A. Adopting permanent magnet synchronous high-temperature resistant outer rotor motor, energy-saving and efficient.
B. Small size and light weight.
C. Low noise.
D. Simple structure.
E. Lifetime maintenance free.
F. Temperature rise is controllable, no operational hazards
G. Source manufacturer, over ten years of brand, affordable price.
G. Source manufacturer, over ten years of brand, affordable price.
H. Leading technology, lightweight motor, and smaller installation space.
I. Having an independent production line and producing the entire process in-house makes it more reliable.

Aluminum alloy blade
High quality lightweight, thickness 2mm;
High rigidity, strength and toughness;
Corrosion and fatigue resistance.
VFD
Overload, voltage surge, phase loss protection;
High rigidity, low loss, high efficiency;
Effectively suppressing noise and vibration;
IP54, efficient and energy-saving


PMSM motor
Natural cooling, fast heat dissipation;
No gears, high transmission efficiency;
No lubricating oil, maintenance free;
IP55, efficient and energy-saving.
Motor Production Line
Coil Winding

Coordinate Test

Motor Tester

Motor Assembly

Packing


Technical Specification
Parameter | Model | ||||
SYP-37 | SYP-48 | SYP-55 | SYP-61 | SYP-73 | |
Diameter | 3.7m(12FT) | 4.8m(16FT) | 5.5m(18FT) | 6.1m(20FT) | 7.3m(24FT) |
Power | 0.50KW | 0.75KW | 0.90KW | 1.2KW | 1.5KW |
Speed | 90RPM | 80RPM | 75RPM | 70RPM | 70RPM |
Voltage | 220V/380V | 220V/380V | 220V/380V | 220V/380V | 220V/380V |
Current | 2.3A/1.3A | 3.4A/1.9A | 4.1A/2.4A | 5.5A/3.2A | 6.8A/3.9A |
Frequency | 50/60HZ | 50/60HZ | 50/60HZ | 50/60HZ | 50/60HZ |
Weight | 55KG | 70KG | 80KG | 105KG | 120KG |
Coverage Area | 400m2 | 600m2 | 800m2 | 1000m2 | 1200m2 |
Air Volume | 6800m3/m | 8800m3/m | 10800m3/m | 11800m3/m | 13800m3/m |
Application
Our Customer
RFQ
1: Are you a manufacturer or trading company?
A: We are manufacturer in Shanghai focusing on HVLS fans since 2014.
7. What is your quality control process?
9. What's the MOQ?

Our Customer

RFQ
1: Are you a manufacturer or trading company?
A: We are manufacturer in Shanghai focusing on HVLS fans since 2014.
2: Can you do customize?
A: Yes, we can do OEM at MOQ requirement.
A: Yes, we can do OEM at MOQ requirement.
3:How do you guarantee the quality?
A:All fans will be tested before delivery and we guarantee the whole fan for 3 years.
4:What services can you provide?
Accepted Delivery Terms: FOB,CFR,EXW,DDP,DDU,Express Delivery;
Accepted Payment Currency:USD,EUR,JPY,HKD,CNY;
Accepted Payment Term: T/T;
Accepted Delivery Terms: FOB,CFR,EXW,DDP,DDU,Express Delivery;
Accepted Payment Currency:USD,EUR,JPY,HKD,CNY;
Accepted Payment Term: T/T;
5. What's the payment term?
A: Usually we appreciate T/T 50% deposit in advance, and the balance shall be paid before delivery.
6.How about the delivery time?
A: Generally speaking, the lead time is within 10 days after order confirmation.
7. What is your quality control process?
A: All our goods are inspected 4 times by QC staff to meet the requirements under CE, ISO,ROHS.
8. Can your company handle shipment for customers?
A: Yes, sure, and our departure port is Shanghai port.
9. What's the MOQ?
A: The MOQ is 1PC.